26-20 Jackson Avenue is moving toward completion. On Saturday, construction crews took down the sidewalk shed roughly two months after workers did a full reveal on the building.1 Still, it looks like there is some work to do on the ground floor, specifically with the windows and the interior space.
According to the filings with the Department of Buildings, there will be nine residential units (9,130 square feet) and one commercial space (1,692 square feet) in the building.2 The original delivery date was Summer, 2014.