We last stopped by 41-21 28th Street in September when construction crews did a full reveal of the building.1 When we stopped by last week, we saw that that construction crews have now peeled away plywood fencing on the ground floor, as seen in the photo below. According to permits filed with the DOB, the building is […]
Continue reading…
Posts tagged with '41-21 28th Street'
Full Reveal: 41-21 28th Street
We last stopped by 41-21 28th Street in April when we saw that facade work had started and pipe scaffolding was up on the building.1 When we stopped by last week, we saw that facade work has finished, as crews have done a full reveal, as seen in the photo below. On-site signage calls for a fall […]
Continue reading…
Pipe scaffolding up at 41-21 28th Street
We last stopped by 41-21 28th Street in September when we reported that the building had just topped out.1 Since then, construction crews have put up scaffolding on the building and facade work is well underway, as seen in the photo below. On-site signage calls for a fall 2016 delivery date, but at this rate, a […]
Continue reading…
41-21 28th Street tops out
We last stopped by 41-21 28th Street in May when we saw that construction had reached the sixth floor.1 When we stopped by last week, we saw that the building has topped out on the 16-story build, as seen in the photo below. On-site signage calls for a fall 2016 delivery date. According to permits filed with the […]
Continue reading…
41-21 28th Street reaches sixth floor
In March, we stopped by 41-21 28th Street and noted that the structure had cleared the construction fence.1 When we stopped by last week, we saw that construction has has now reached the sixth floor, as seen in the photo below. On-site signage calls for a fall 2016 delivery date. According to permits filed with the DOB, plans […]
Continue reading…